Se Habla Español Español
Resource · Schools

AHERA compliance checklist for Texas school districts

The recurring obligations, on one page, for the designated person who has to keep them all straight.

Updated September 2026·5 min read·For facilities directors and AHERA designated persons

Why this matters

The Asbestos Hazard Emergency Response Act (AHERA) applies to every public and non-profit private K–12 school in Texas, regardless of whether asbestos has been found. Compliance is a calendar, not a one-time project — and the audits that catch districts almost always find a missed recurring item rather than a missing original inspection.

Every six months

  • Periodic surveillance of every building with known or assumed asbestos-containing material (ACM), by trained staff — a visual check for damage or deterioration, documented and filed in the management plan.
  • Confirm warning labels in routine maintenance areas are present and legible; replace any that are missing.

Every three years

  • Reinspection of all known or assumed ACM by an accredited asbestos inspector (in Texas, a TDSHS-licensed inspector), with condition reassessment and updated response-action recommendations from a licensed management planner.
  • Update the management plan with the reinspection report and any changes in response actions.

Every year

  • Written notification to parent, teacher, and employee organizations that the management plan is available for review and describing any asbestos-related activity completed or planned.
  • Confirm every custodial and maintenance employee has had the 2-hour awareness training, and that staff who perform O&M work on or near ACM have the additional 14-hour training. Add new hires as they arrive.

Ongoing

  • A formally appointed designated person who has completed the required training and oversees the program.
  • The management plan kept current and available in the district office and each campus, and producible within five working days of a request.
  • Records retained for the life of each building: inspections, surveillance, response actions, training, notifications, and air sampling.
  • Before any renovation or demolition, the AHERA plan is consulted and a licensed pre-renovation survey is performed as the Texas rules require — the AHERA inspection is not a substitute for a project-specific survey.
  • Short-term workers (plumbers, electricians, telecom crews) are told where ACM is before they open walls or ceilings.

Where districts get caught

  • Surveillance performed but not documented — if it isn't in the plan, it didn't happen.
  • A three-year reinspection that lapsed by a few months when a facilities director changed.
  • Annual notifications that went out to parents but not to employee organizations.
  • New buildings or portables never added to the management plan (a new building needs either an inspection or an architect's statement that no ACM was specified).
  • Renovations done from the AHERA inventory alone, without the pre-renovation survey Texas requires.

TSEC performs three-year reinspections, management plan updates, and pre-renovation surveys for Texas districts, and can train your staff for the six-month surveillance so it happens on time. Request a proposal for your district.